Waste water treatment research in Alborz
Contents |
[edit] Introduction
The following abstract reviews the industrial waste water process that may be used for the treatment and purification of waste water that has become contaminated as a result of industry production lines creating an undesirable by product.
After treatment, the effluent - the treated or untreated waste water - might be released to a sanitary canal or sewer or even to the surface water in the environment. Recent actions have been taken to prevent or minimise such production or to reuse purified wastewater within the manufacturing lines.
[edit] Research
The objective of this research was to investigate issues and obstacles of a waste water treatment plant during the process of its preparation, establishment and maintenance in industrial city of Alborz, Iran. This research aimed to reveal the most effective factors in the process of the environmental management project to minimise or diminish negative consequences and consider the effectiveness of those factors.
To conduct the research, a descriptive method was used to collect data. A questionnaire was used during an approved interview process. The distributed questionnaires were completed by employees who worked in industrial factories in Alborz. Grounded research theory (applicable for the project management system), Likert scales, Comparative Scaling Technique and Rank Order Scaling were used to develop the questionnaire.
[edit] Findings
The findings of the study indicated that out of 306 factories, 223 of which responded, only 160 currently have established wastewater treatment plants. Of those who responded, 37% noted that ‘Governmental obligation or national regulation’ has been the most effective factor in prompting them to establish a treatment plant; without that, they would not have been worried about the necessity or the environment.
Moreover, 25% identified financial deficits and concerns over future difficulties (such as unpredicted costs) while 22% identified maintenance. Inaccurate budgets (27%) and safety issues (30%) were common responses; 39% stated costly procedures (including equipment and controlling devices and staff) as the primary obstacles.
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Art of Building CIOB photographic competition public vote
The last week to vote for a winner until 10 January 2025.
The future of the Grenfell Tower site
Principles, promises, recommendations and a decision expected in February 2025.
20 years of the Chartered Environmentalist
If not now, when?
Journeys in Industrious England
Thomas Baskerville’s expeditions in the 1600s.
Top 25 Building Safety Wiki articles of 2024
Take a look what most people have been reading about.
Life and death at Highgate Cemetery
Balancing burials and tourism.
The 25 most read articles on DB for 2024
Design portion to procurement route and all between.
The act of preservation may sometimes be futile.
Twas the site before Christmas...
A rhyme for the industry and a thankyou to our supporters.
Plumbing and heating systems in schools
New apprentice pay rates coming into effect in the new year
Addressing the impact of recent national minimum wage changes.
EBSSA support for the new industry competence structure
The Engineering and Building Services Skills Authority, in working group 2.
Notes from BSRIA Sustainable Futures briefing
From carbon down to the all important customer: Redefining Retrofit for Net Zero Living.
Principal Designer: A New Opportunity for Architects
ACA launches a Principal Designer Register for architects.